Construction at Rambler continues to advance steadily and is still on track for early delivery before the August 2025 move-in.
April’s updates include progress highlights on:
This month, we are excited to share that Rambler Columbus has received its TCO (Temporary Certificate of Occupancy), meaning the team can start moving in FF&E (Furniture, Fixtures, and Equipment — things like desks, chairs, beds, shelving, appliances — basically, all the movable items that aren’t permanently attached to the building).
Exterior
Exterior work continues to be finalized as we enter the summer months. The Rambler sign is in and ready to be installed on the exterior by the end of the month. Green roof plants have been installed and trees have been added on the sidewalks lining the entrances to the two-story townhomes.

Rambler sign to be attached to the entrance by end of the month.

Rambler Columbus exterior.

Rambler Columbus exterior.

Rambler Columbus exterior.

Rambler Columbus exterior.

Rambler Columbus green roof plant installed.

Rambler Columbus townhome entrances.

Patio space off the clubroom and pool deck at Rambler Columbus.

Courtyard space at Rambler Columbus.
Units and INTERIors
Interior construction is moving forward smoothly, with major installations and finishing details in progress throughout the towers. Crews are currently installing doors, trim, and appliances, alongside ongoing painting and drywall work. 270 out of 370 units have been owner punched. Floors 4-7 are 100% owner punched and are in the final cleaning phase.

Entryway to a unit at Rambler Columbus.

Carpet installed in the hallways of Rambler Columbus.

Rambler Columbus kitchen.

Rambler Columbus kitchen.

Rambler Columbus living room.

Rambler Columbus bedroom.

Rambler Columbus bathroom.

Rambler Columbus bathroom.

Inside of the first floor of one of Rambler Columbus’ two story townhomes.
Amenity Areas
Work on shared amenity continues across the building. Light fixtures, railings, booths and conference room glass are installed in the lobby and study floor. Cabinetry and framework are installed in the lobby at Rambler’s in-house coffee shop, Daydreamer. The sauna is installed, and the fitness center is tiled and painted, ready for free weights and machines to be installed.

Rambler Columbus lobby.

Rambler Columbus lobby.

Staircase to the study mezzo in the Rambler Columbus lobby.

Daydreamer at Rambler Columbus.

Daydreamer and lobby at Rambler Columbus.

Daydreamer at Rambler Columbus.

Fireplace in lobby of Rambler Columbus.

Cabinetry and booths installed inside lobby at Rambler Columbus.

Rambler Columbus clubroom, just off the pool deck.

Private study rooms on the study mezzanine at Rambler Columbus.

Booths inside the study mezzo at Rambler Columbus.

Booths inside the study mezzo at Rambler Columbus.

Kitchen in Rambler Columbus clubroom, just off the pool deck.

Kitchen in Rambler Columbus clubroom, just off the pool deck.

Sauna at Rambler Columbus.

Rambler Columbus fitness center.
Unit Walkthroughs
Check out the progress on our units by watching our walkthroughs below!
The Joule
View this post on Instagram
The Ivy
View this post on Instagram
The Crescent
View this post on Instagram
The Biltmore
View this post on Instagram
The Hoxton
View this post on Instagram
The Drake
View this post on Instagram
The moxy
View this post on Instagram
We’re pleased with the ongoing progress and look forward to sharing more as we approach completion. For any questions, feel free to reach out to our leasing team!